Donate using PayPal

Photo listing: cycleways (infrastructure)

The most recent photos are listed first. See also photomap view.

This listing only shows photos within Truro.
Go to the national CycleStreets photo listings for photos beyond.

Crossing from The Old Railway Siding to join NCN route 3 at Hayle harbour

Barriers at the start of the Old Railway Siding to Hayle station - now asphalted

Link from The Old Railway Siding to the westbound platform at Hayle station

Start of The Old Railway Siding from Hayle station to the harbour - now asphalted

Cyclist on the byway past Hayle station

Stepped route between the platforms at Hayle station and the byway towards the harbour

Asphalted path northeast from Hayle station - cyclists should take the service road to the right.

Modal filter on bridge over the railway, Hayle

Modal filters on the bridge over the Old Railway Siding between Hayle harbour and station

The Old Railway Siding between Hayle harbour and station - now asphalted

The Old Railway Siding between Hayle harbour and station - now asphalted

Modal filter on the bridge over the former tramway to Hayle harbour

Start of shared-use route from Lelant to Carbis Bay

Modal filter by the boating lake, Helston

Link to the A394 - but most cyclists will do better to turn left up Grange Road.

Shared-use path by the A390

Shared-use path past Truro's new Lidl supermarket

New shared-use path (the sign is around the corner ahead) and zig-zag ramp to Truro's new Lidl supermarket

NCN route 3 crossing the A390 in Truro - no traffic lights, so good luck. There's a light-controlled crossing at Sainsbury's, not far to the west.

Two Shared Path signs on the route towards Truro station

Shared-use link towards Truro station

Modal filter and access to County Hall from the Newham Trail, Truro

Junction to County Hall from the Newham Trail

Start of the Newham Trail, Truro (a cycleway, though shown as a footpath on OpenCycleMap)

Shared-use path at the start of the Newham Trail in Truro

Modal filter to the left but not to the right, oddly.

Cornwall Council says that the St Agnes to Sevenmilestone section of the Saints Trail opened in December 2022 so it must be true. No signage yet.

End of shared-use cycleway from the A30 Chiverton interchange

End of shared-use path from the A30 Chiverton interchange, with bank holiday cyclists

Route sign towards Truro from the A30 Chiverton interchange

Route from Truro to the A30 Chiverton interchange (due to be replaced by a bridge by the end of 2023)

Gate and route sign on the route from the A30 interchange towards Truro

Start of shared-use path at the Chiverton A30 interchange - a traffic-free bridge is promised by the end of 2023.

Crossing of the busy A30 at the Chiverton interchange - a traffic-free bridge is promised by the end of 2023.

Crossing of the busy A30 at the Chiverton interchange - a traffic-free bridge is promised by the end of 2023.

End of shared-use path by the A30 Chiverton interchange - this bit might conceivably be used by a few crazed Land's End-John O'Groats riders using the A30, but no-one else.

Shared-use path by the A30 Chiverton interchange

Shared-use path by the A30 Chiverton interchange

Start of shared-use path on closed-off road by the A30 Chiverton interchange

Asphalted path past Carbis Bay station

Fork right on the steep asphalted path to Carbis Bay station

Zig right on the steep asphalted path down to Carbis Bay station

Steep asphalted path down to Carbis Bay station, and steps to the left.

Asphalted path west from Carbis Bay station

Steep asphalted path up from Carbis Bay station to the A3074

Steep asphalted path down to Carbis Bay station

Start of shared-use path in Camborne Recreation Ground

End of cycleway south of Camborne Recreation Ground

Exit from new housing development with a tiny stretch of shared-use footway

Cycleway past new housing development, Camborne

Turn left here on NCN route 3 westbound from Camborne

BMX track at a Camborne school

NCN route 3 west from Camborne on an asphalted bridleway

Junction of NCN route 3 and route through Camborne Recreation Ground

Modal filter, St Ives

Shared-use section of NCN route 3 west from Hayle

Modal filter from NCN route 3 to new housing development, Hayle

Cyclists on NCN route 3 can swing left onto the shared-use path here.

Access point for the Newham Trail at the bottom of the track beside County Hall

Newly renovated Penwethers Bridge

August 2022 - Liskeard Town Council is proposing to limit Charter Way (the A390) to 30mph and to add a segregated cycle and footpath, plus a two-way cycle path on Plymouth Road and other changes including more 20mph zones.

Modal filter - designed for pedestrians rather than cycles - on the edge of Helston

Start of shared-use route around the Falmouth Road roundabout, Helston

Cut-through in the Tremenheere estate, Helston

Junction on 'cycleway' to Forth Gwedhen, Helston

Cycleway from Budock Water to Falmouth (and footpath through the field to the left)

Cycleway to Budock Water

Cycleway to Budock Water

Link off the cycle route to Budock Water

Link off the cycle route to Budock Water

Cycle route from Budock Water towards Falmouth

Cycle route to Budock Water

Start of cycle route to Budock Water

The short shared-use route starts here

End of shared-use route

End of shared-use route on the former course of the Helston-Falmouth road.

Decent link from new housing to the B3297, Helston

Shared-use path (NCN route 3) from Penzance station towards Marazion.

Start of resurfaced shared-use path (NCN route 3) from Penzance to Marazion

Resurfaced shared-use path (NCN route 3) at the Eastern Green footbridge

A proper route for NCN route 3 has been created through the Long Rock car park

A proper route for NCN route 3 has been created through the Long Rock car park

The shared-use coast path (NCN route 3) from Station Lane car park, Marazion, to Penzance has been resurfaced - at the Long Rock level crossing and car park.

The shared-use coast path (NCN route 3) from Station Lane car park, Marazion, to Penzance has been resurfaced.

The shared-use coast path (NCN route 3) from Station Lane car park, Marazion, to Penzance has been resurfaced.

The shared-use coast path (NCN route 3) from Penzance to Station Lane car park, Marazion, has been resurfaced.

The shared-use coast path (NCN route 3) from Station Lane car park, Marazion, to Penzance has been resurfaced.

A proper route for NCN route 3 has been created through the Station Lane car park

Shared-use section of NCN route 3 towards Marazion

Sustrans 'milepost' on NCN route 3 entering Mevagissey

Start of off-road section of NCN route 3 from Land's End to Sennen

Off-road section of NCN route 3, Sennen

Start of off-road section of NCN route 3 towards Sennen

NCN route 3 east from Land's End.

Start of NCN route 3 from Land's End (the wooden gate has been replaced, not much change since 2016 otherwise - see #81994)

Bridleway beside a farm track on the National Trust's Penrose Estate

End of the new bridleway onto the National Trust's Penrose Estate

Access to the new bridleway onto the National Trust's Penrose Estate

The new bridleway onto the National Trust's Penrose Estate

Start of new bridleway onto the National Trust's Penrose Estate (not yet on any online mapping or satellite imagery)

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://truro.cyclestreets.net/photos/cycleways/other/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.