Crossing from The Old Railway Siding to join NCN route 3 at Hayle harbour
Barriers at the start of the Old Railway Siding to Hayle station - now asphalted
Link from The Old Railway Siding to the westbound platform at Hayle station
Start of The Old Railway Siding from Hayle station to the harbour - now asphalted
Cyclist on the byway past Hayle station
Stepped route between the platforms at Hayle station and the byway towards the harbour
Asphalted path northeast from Hayle station - cyclists should take the service road to the right.
Modal filter on bridge over the railway, Hayle
Modal filters on the bridge over the Old Railway Siding between Hayle harbour and station
The Old Railway Siding between Hayle harbour and station - now asphalted
The Old Railway Siding between Hayle harbour and station - now asphalted
Modal filter on the bridge over the former tramway to Hayle harbour
Start of shared-use route from Lelant to Carbis Bay
Modal filter by the boating lake, Helston
Link to the A394 - but most cyclists will do better to turn left up Grange Road.
Shared-use path by the A390
Shared-use path past Truro's new Lidl supermarket
New shared-use path (the sign is around the corner ahead) and zig-zag ramp to Truro's new Lidl supermarket
NCN route 3 crossing the A390 in Truro - no traffic lights, so good luck. There's a light-controlled crossing at Sainsbury's, not far to the west.
Two Shared Path signs on the route towards Truro station
Shared-use link towards Truro station
Modal filter and access to County Hall from the Newham Trail, Truro
Junction to County Hall from the Newham Trail
Start of the Newham Trail, Truro (a cycleway, though shown as a footpath on OpenCycleMap)
Shared-use path at the start of the Newham Trail in Truro
Modal filter to the left but not to the right, oddly.
Cornwall Council says that the St Agnes to Sevenmilestone section of the Saints Trail opened in December 2022 so it must be true. No signage yet.
End of shared-use cycleway from the A30 Chiverton interchange
End of shared-use path from the A30 Chiverton interchange, with bank holiday cyclists
Route sign towards Truro from the A30 Chiverton interchange
Route from Truro to the A30 Chiverton interchange (due to be replaced by a bridge by the end of 2023)
Gate and route sign on the route from the A30 interchange towards Truro
Start of shared-use path at the Chiverton A30 interchange - a traffic-free bridge is promised by the end of 2023.
Crossing of the busy A30 at the Chiverton interchange - a traffic-free bridge is promised by the end of 2023.
Crossing of the busy A30 at the Chiverton interchange - a traffic-free bridge is promised by the end of 2023.
End of shared-use path by the A30 Chiverton interchange - this bit might conceivably be used by a few crazed Land's End-John O'Groats riders using the A30, but no-one else.
Shared-use path by the A30 Chiverton interchange
Shared-use path by the A30 Chiverton interchange
Start of shared-use path on closed-off road by the A30 Chiverton interchange
Asphalted path past Carbis Bay station
Fork right on the steep asphalted path to Carbis Bay station
Zig right on the steep asphalted path down to Carbis Bay station
Steep asphalted path down to Carbis Bay station, and steps to the left.
Asphalted path west from Carbis Bay station
Steep asphalted path up from Carbis Bay station to the A3074
Steep asphalted path down to Carbis Bay station
Start of shared-use path in Camborne Recreation Ground
End of cycleway south of Camborne Recreation Ground
Exit from new housing development with a tiny stretch of shared-use footway
Cycleway past new housing development, Camborne
Turn left here on NCN route 3 westbound from Camborne
BMX track at a Camborne school
NCN route 3 west from Camborne on an asphalted bridleway
Junction of NCN route 3 and route through Camborne Recreation Ground
Shared-use section of NCN route 3 west from Hayle
Modal filter from NCN route 3 to new housing development, Hayle
Cyclists on NCN route 3 can swing left onto the shared-use path here.
Access point for the Newham Trail at the bottom of the track beside County Hall
Newly renovated Penwethers Bridge
August 2022 - Liskeard Town Council is proposing to limit Charter Way (the A390) to 30mph and to add a segregated cycle and footpath, plus a two-way cycle path on Plymouth Road and other changes including more 20mph zones.
Modal filter - designed for pedestrians rather than cycles - on the edge of Helston
Start of shared-use route around the Falmouth Road roundabout, Helston
Cut-through in the Tremenheere estate, Helston
Junction on 'cycleway' to Forth Gwedhen, Helston
Cycleway from Budock Water to Falmouth (and footpath through the field to the left)
Link off the cycle route to Budock Water
Link off the cycle route to Budock Water
Cycle route from Budock Water towards Falmouth
Cycle route to Budock Water
Start of cycle route to Budock Water
The short shared-use route starts here
End of shared-use route on the former course of the Helston-Falmouth road.
Decent link from new housing to the B3297, Helston
Shared-use path (NCN route 3) from Penzance station towards Marazion.
Start of resurfaced shared-use path (NCN route 3) from Penzance to Marazion
Resurfaced shared-use path (NCN route 3) at the Eastern Green footbridge
A proper route for NCN route 3 has been created through the Long Rock car park
A proper route for NCN route 3 has been created through the Long Rock car park
The shared-use coast path (NCN route 3) from Station Lane car park, Marazion, to Penzance has been resurfaced - at the Long Rock level crossing and car park.
The shared-use coast path (NCN route 3) from Station Lane car park, Marazion, to Penzance has been resurfaced.
The shared-use coast path (NCN route 3) from Station Lane car park, Marazion, to Penzance has been resurfaced.
The shared-use coast path (NCN route 3) from Penzance to Station Lane car park, Marazion, has been resurfaced.
The shared-use coast path (NCN route 3) from Station Lane car park, Marazion, to Penzance has been resurfaced.
A proper route for NCN route 3 has been created through the Station Lane car park
Shared-use section of NCN route 3 towards Marazion
Sustrans 'milepost' on NCN route 3 entering Mevagissey
Start of off-road section of NCN route 3 from Land's End to Sennen
Off-road section of NCN route 3, Sennen
Start of off-road section of NCN route 3 towards Sennen
NCN route 3 east from Land's End.
Start of NCN route 3 from Land's End (the wooden gate has been replaced, not much change since 2016 otherwise - see #81994)
Bridleway beside a farm track on the National Trust's Penrose Estate
End of the new bridleway onto the National Trust's Penrose Estate
Access to the new bridleway onto the National Trust's Penrose Estate
The new bridleway onto the National Trust's Penrose Estate
Start of new bridleway onto the National Trust's Penrose Estate (not yet on any online mapping or satellite imagery)